since all these buildings are designed for seawater cooling system only, the cwpss have to be re-provisioned to initial areas of reclamation before the existing ones could be rendered inoperative by reclamation to ensure continued operation of the buildings 由于这些建筑物的设计只能容许海水冷却系统,有需要在停用现有的冷却用水抽水站前,将其重置于中区填海第三期工程中初期的填海范围内,以确保有关的建筑物能继续运作。